Seven Mile Bridge cerrará para carrera a pie anual

In this Monday, Jan. 10, 2022, drone aerial photo provided by the Florida Keys News Bureau, boats pass underneath the new, left, and old, right, Seven Mile bridges in the Florida Keys. The old bridge originally was part of Henry Flagler's Florida Keys Over-Sea Railroad that was completed in 1912. The railroad ceased operations in 1935 and was converted into a highway that opened in 1938. In 1982, construction was completed on the new Seven Mile Bridge that continues to carry motor vehicles between the South Florida mainland throughout the Keys to Key West. (Andy Newman/Florida Keys News Bureau via AP) (Andy Newman)

MARATHON, Fla. – El Puente de las Siete Millas se cerrará temporalmente al tráfico de vehículos para una carrera anual a pie sobre la convergencia del Océano Atlántico y el Golfo de México.

Los oficiales del condado de Monroe detendrán el tráfico el sábado por la mañana para la carrera del puente de siete millas.

Recommended Videos



El puente es el más largo de los 42 tramos sobre el agua que ayudan a comprender la Carretera de Ultramar de los Cayos de Florida.

La carrera será a las 6:45 a.m. e irá de dirección oeste a este, comenzando en el lado Lower Keys del puente y terminando en Maratón.

El concurso es uno de los eventos de carrera más populares en el sureste de los Estados Unidos, generalmente llenando los 1,500 espacios de participantes a los pocos minutos de la apertura de la inscripción en línea.


About the Author

Recommended Videos